Installation Guidelines
1. Base Preparation: Ensure the mounting surface is clean, grease‑free and fully dry, with no remaining wax. Perform a preliminary dry layout before installation.
2. Working Temperature: Maintain an installation temperature of 15°C–35°C and avoid exceptionally hot or humid conditions.
3. Application Method: Carefully remove the backing sheet and secure the material with firm, even pressure. On curved areas, proceed gradually to avoid air pockets and shape distortion. Let the adhesive set under natural conditions.
4. Unsuitable Bases: Installation is not recommended on damp, moldy, unstable or peeling surfaces.

Marine Decking & Custom Kits
Yacht Decking
Fishing Boat Decking
RIB Decking
Kayak Deck Pads
Jet Ski Traction Mats
Onboard Comfort & Utility Pads
Cooler Pads
Coaming Bolster Pad
Step Pads
Helm Station Pads
Watersports & Fishing Gear
Fish Rulers
PWC Traction Pads
Stand-Up Paddleboard (SUP) Pads
Hydrofoil Surfboard Pads
Other
RV & Camper Flooring
Inflatable Floating Docks
Golf Cart Mats
Auto Trunk Liners
Bathtub Anti-Slip Mats
Stair Treads
Swim Platform Mats